Skip to main content

Headquarter of the Archaeology Cabinet, Old Havana


Owner:  Historian Of The City Bureau
Builder:  Monuments Restoration Contractors
Software used: AutoCAD, 3dsMax, Corel DRAW
Lead Designer: Alejandro Ventura Alfonso


The inclusion in the traditional block of a new building for the headquarters of the Cabinet of Archaeology. 
The construction consists of the following spaces: Laboratories, Offices, Conference room, Courtyard, Bathrooms and other areas of service and recreation.
In this construction,  were used   traditional material in Cuba, such as reinforced concrete, concrete beams prestressed for horizontal structures, the walls were erected with blocks of mortar, and terminations followed the traditional style with plate pottery, stained glass, etc

Comments

Post a Comment

Popular posts from this blog

Yonge & Sheppard Tower / 11 & 25 Ordnance Street Development - Laminated Stone Cladding System

(Architectural and Structural Designer  for StoneLamina ) Stone Cladding System Prepare and Design Shop Drawings, Details and Cutsheet Packages. BOM, etc. http://stonelamina.com

Residential-House Extension 57 Brookdale Ave. Toronto, ON, M5M 1P2

    Company: Mechatrosoft Inc     Year: 2013 This project included the following tasks: Site Plan, Existing And Proposed Floor Plans, Sections, Washroom Details, Stair,Underpinning Drawings Hvac Layouts, Plumbing Layouts, Power And Lighting Design Before & After Renovation

Grid Dependent Solar PV System Projects

ATIMIA TECH INC., Toronto, ON (Designer) Grid Dependent Solar PV System Preliminary Design, Site documentation and site analysis, OESC analysis, Zoning analysis and preparation of Development Permit applications, Design document preparation (Array Wiring Plan, Racking Design for construction, etc) Prepared construction Drawings and Details, Electrical and Structural for Grid Dependent Solar PV System, using AutoCAD. Revised Projects and new solutions applied according to OBC and OESC.