Skip to main content

National Capitol of Cuba, Havana City



      
Address: Block bounded by the streets Prado, Dragons, Industry, and San Jose. Havana.
Original Use: Congress Palace
Construction date: 1927-1929
Authors: Raul Otero, Govantes and Cabarrocas, Eugenio Rayneri Piedra, Jose Maria Bens Arrarte and others.
Current Intervention: Start in 2011


As Chief Architect, I worked in the project on this first stage, this is one of the most important building of Cuba. At this stage defined the general lines of intervention and the returning to original use of the building.
The Capitol building covers a total area of 43 418 square meters, of which 13 484 corresponds to the building and 26 391 square meters to the surrounding area of gardens and parks. The remaining 3 543 square meters is dedicated to the expansion of streets and sidewalks adjacent to the building. The total length of the building is 207.44 meters. Its architectural composition and volume was structured from a central body composed of the monumental staircase of 35.90 meters wide by 27.43 meters long. It presents a total of 55 steps interrupted by three breaks in between. 

Comments

Post a Comment

Popular posts from this blog

Yonge & Sheppard Tower / 11 & 25 Ordnance Street Development - Laminated Stone Cladding System

(Architectural and Structural Designer  for StoneLamina ) Stone Cladding System Prepare and Design Shop Drawings, Details and Cutsheet Packages. BOM, etc. http://stonelamina.com

Residential-House Extension 57 Brookdale Ave. Toronto, ON, M5M 1P2

    Company: Mechatrosoft Inc     Year: 2013 This project included the following tasks: Site Plan, Existing And Proposed Floor Plans, Sections, Washroom Details, Stair,Underpinning Drawings Hvac Layouts, Plumbing Layouts, Power And Lighting Design Before & After Renovation

Grid Dependent Solar PV System Projects

ATIMIA TECH INC., Toronto, ON (Designer) Grid Dependent Solar PV System Preliminary Design, Site documentation and site analysis, OESC analysis, Zoning analysis and preparation of Development Permit applications, Design document preparation (Array Wiring Plan, Racking Design for construction, etc) Prepared construction Drawings and Details, Electrical and Structural for Grid Dependent Solar PV System, using AutoCAD. Revised Projects and new solutions applied according to OBC and OESC.