Skip to main content

C & M Building in Grand Cayman

Owner:  Mc Field Family
Builder: Capital Design
Software used: Auto CAD, 3ds Max, Corel DRAW
Lead Designer: Alejandro Ventura Alfonso

Main duties as Project Manager-Designer (office and site)
 
Prepare construction projects.
Analyze technical solutions.
Preparation of construction drawings and details
Supervised and manage the rest of the project team
Supervised and technical control on site of construction works.
Planned, organized and control construction projects according to schedule.
Prepared schedules and monitoring the construction progress.
Prepared and negotiated, revisions, changes and additions to contractual agreements with architects, consultants, clients.
Inspected work in site.
Supervised the work in others fields, such as structures, plumbing, AC, weak currents, and electrical work.

After Hurricane Ivan, as it passes through the Cayman Islands, it was necessary to rebuild the C & M  building; and take the opportunity to add new functions, such as the addition of 4-one room apartments, 4 spaces for offices, maintain existing church and shop for appliances
Formally, we varied the volume of the building, expanding it to its side and placing the stairs.

Comments

Popular posts from this blog

Yonge & Sheppard Tower / 11 & 25 Ordnance Street Development - Laminated Stone Cladding System

(Architectural and Structural Designer  for StoneLamina ) Stone Cladding System Prepare and Design Shop Drawings, Details and Cutsheet Packages. BOM, etc. http://stonelamina.com

Residential-House Extension 57 Brookdale Ave. Toronto, ON, M5M 1P2

    Company: Mechatrosoft Inc     Year: 2013 This project included the following tasks: Site Plan, Existing And Proposed Floor Plans, Sections, Washroom Details, Stair,Underpinning Drawings Hvac Layouts, Plumbing Layouts, Power And Lighting Design Before & After Renovation

Grid Dependent Solar PV System Projects

ATIMIA TECH INC., Toronto, ON (Designer) Grid Dependent Solar PV System Preliminary Design, Site documentation and site analysis, OESC analysis, Zoning analysis and preparation of Development Permit applications, Design document preparation (Array Wiring Plan, Racking Design for construction, etc) Prepared construction Drawings and Details, Electrical and Structural for Grid Dependent Solar PV System, using AutoCAD. Revised Projects and new solutions applied according to OBC and OESC.